[1] |
WU Donglei,WANG Wei,GUO Qingwen,et al.Combined Fenton-SBR process for bamboo industry wastewater treatment.Chemical Engineering Journal,2013,214:278-284
|
[2] |
COLOMER J.,WONG A.,COMA M.,et al.Qualitative estimation of SBR biological nutrient removal performance for wastewater treatment.Journal of Chemical Technology & Biotechnology,2013,88(7):1305-1313
|
[3] |
PARK H.O.,OH S.,BADE R.,et al.Application of A2O moving-bed biofilm reactors for textile dyeing wastewater treatment.Korean Journal of Chemical Engineering,2010,27(3):893-899
|
[4] |
LIU Ya'nan,HU Jinglong,XU Bingjie,et al.Isolation and identification of an iopromide-degrading strain and its application in an A2O system.Bioresource Technology,2013,134:36-42
|
[5] |
叶长兵,韩相奎,汤洁,等.异波折板水解酸化-A2O一体化反应器实验研究.环境工程学报,2010,4(3):503-507YE Changbing,HAN Xiangkui,TANG Jie,et al.Integrated reactor of opposite folded plate hydrolysis and acidogenosis-A2O for sewage treatment.Chinese Journal of Environmental Engineering,2010,4(3):503-507(in Chinese)
|
[6] |
杨小丽,洪凯,张雷,等.活性炭海绵动态膜生物反应器用于污水处理提标改造中试研究.土木建筑与环境工程,2014,36(2):89-93YANG Xiaoli,HONG Kai,ZHANG Lei,et al.Application of activated carbon sponge-dynamic membrane bioreactor in transformation of wastewater treatment.Journal of Chongqing Jianzhu University,2014,36(2):89-93(in Chinese)
|
[7] |
王阿华.城镇污水处理厂提标改造的若干问题探讨.中国给水排水,2010,26(2):19-22 WANG A'hua.Discussion on some problems in upgrading and reconstruction of municipal wastewater treatment plant.China Water & Wastewater,2010,26(2):19-22(in Chinese)
|
[8] |
章一丹,谢娟,徐灏龙.太湖流域某城镇污水处理厂提标改造工程设计.中国给水排水,2013,29(22):71-74Zhang Yidan,Xie Juan,Xu Haolong.Design of upgrading reconstruction project of municipal wastewater treatment plant in Taihu lake basin.China Water & Wastewater,2013,29(22):71-74(in Chinese)
|
[9] |
刘礼祥,陆桂勇,杨旭良,等.城市污水处理厂提标改造与优化调控案例分析.中国给水排水,2010,26(20):24-27LIU Lixiang,LU Guiyong,YANG Xuliang,et al.Case analysis on upgrading reconstruction and optimization control of WWTP.China Water & Wastewater,2010,26(20):24-27(in Chinese)
|
[10] |
林英姿,田大伟,祝伟星,等.长春西郊污水厂AO工艺的调试运行.中国给水排水,2005,21(11):101-103 LIN Yingzi,TIAN Dawei,ZHU Weixing,et al.Commissioning and operation of AO in Changchun City Xijiao municipal wastewater treatment plant.China Water & Wastewater,2005,21(11):101-103(in Chinese)
|
[11] |
张智,赵青,陈杰云,等.好氧移动床多级AO工艺挂膜启动研究.水处理技术,2013,39(6):53-56 ZHANG Zhi,ZHAO Qing,CHEN Jieyun,et al.study on the start-up in aerobic moving-bed multi-stage AO biofilm reactor.Technology of Water Treatment,2013,39(6):53-56(in Chinese)
|
[12] |
周慧,徐得潜,马常仁,等.A/O一膜生物反应器工艺应用于城市污水处理厂出水提标改造的研究.环境污染与防治,2011,33(12):13-17 ZHOU Hui,XU Deqian,MA Changren,et al.Research on the application of A/O-MBR process in transformation of waste water treatment plant.Environmental Pollution and Control,2011,33(12):13-17(in Chinese)
|
[13] |
石凤,刘胜军,马炳勇,等.多段多级AO工艺在污水处理厂升级改造中的应用.给水排水,2011,37(6):34-37
|
[14] |
国家环境保护总局.水和废水监测分析方法.4版.北京:中国环境科学出版社,2002
|
[15] |
马放,任南琪,杨基先.污染控制微生物学实验.哈尔滨:哈尔滨工业大学出版社,2002:103-106
|