Figure 12 ,Table 4
    • 图  1  各种组合工艺效果图

      Figure 1.  The removal performance of Mo and turbidity by different combined coagulation processes

    • 图  2  主要应急处置工程布置示意图

      Figure 2.  Schematic diagram of the main emergency engineering

    • 图  3  应急处置工艺流程图

      Figure 3.  Flow chat of the emergency disposal process in this study

    • 图  4  溶药池工艺图

      Figure 4.  Process diagram of chemical dissolution

    • 图  5  溶药池现场照片

      Figure 5.  Picture of the chemical dissolution on site

    • 图  6  加药管设计图

      Figure 6.  Process diagram of chemical dosing tube

    • 图  7  依吉密河穿孔加药管现场照片

      Figure 7.  Picture of the chemical dosing tube on site near Yijimi River

    • 图  8  兰西老桥多管加药现场照片

      Figure 8.  Picture of the chemical dosing on site on the Lanxilao Bridge

    • 图  9  依吉密河污染态势图

      Figure 9.  The variation of pollution situation of Yijimi River

    • 图  10  依吉密河控制工程现场图片

      Figure 10.  Picture of pollution control on site near Yijimi River

    • 图  11  呼兰河污染态势图

      Figure 11.  The variation of pollution situation in Hulan River

    • 图  12  呼兰河清洁工程现场图片

      Figure 12.  The cleaning project of Hulan River on site